Luxborough Lane Safe Working Design Study (1697)
Formal Process Safety Assessments
12 Nov 2018
-
11 Dec 2018
QEM Solutions were asked to provide technical consultancy in the form of a Safe Working Design Study (SWDS) to assist Murphy Pipelines with the Luxborough Lane Project on behalf of Cadent.
QEM provided a suitable Consultant in the form of a competent person with extensive gas network experience, with the QEM Solutions back-up to support.
We were responsible for assisting with the following activities in line with NG procedure T/SP/G/38 The Application of Safe Working Design Studies during Engineering Design Phases:
-
Scope of project review with discussions with Project Lead
-
SWDS study preparation by reviewing design drawings
-
Chair of SWDS Safety Study Meeting
-
Production of SWDS Study Report
-
Production of SWDS Action sheets
-
Review and Acceptance of SWDS Action Responses