Skanska - Design Co-ordination (1438)
Design Process Compliance
Skanska
Humber
1 Feb 2017
-
Ongoing
QEM Solutions were engaged with Skanska to assist with design and engineering co-ordination.
Skanska were awarded a contract to design and build a replacement high-pressure gas pipeline within a tunnel, underneath the River Humber from Paull to Goxhill, replacing the existing pipeline, which lies on the riverbed.
Over the three year project the joint venture will provide full design and construction of the 5km tunnel underneath the river Humber, inserting a single string of 42” steel pipe and connect into the above-ground installations (AGIs) at Paull and Goxhill.
QEM provided consultancy services to assist with:
-
Initial review of the design requirements
-
Conduct regular progress meeting with the Designer to ensure timely progress
-
Address any engineering issues with the design and answer any technical queries that arise
-
Detail project documentation required for the start of the project
-
Review the design for constructability
-
Coordinate any HAZID, HAZOP, SWDS and HAZCON
-
Familiar himself with the route and identify any issues
-
Coordinate the design with all parties
-
Work and support the delivery team
-
Ensure the NG processes are complied with, including G35
-
Provide engineering support on routing and crossing design
-
Liaise with third parties as required