UK & Ireland Featured Project: Entrepose - Asselby to Pannal 48” Gas Pipeline

QEM Solutions provided project services and management consultancy to ensure that all internal processes associated with quality / risk mitigation during design were successfully developed and implemented. QEM Solutions managed all activities associated with quality, technical writing, document control and final project handover.

Tell Me More...
Overseas Featured Project: Capita Symonds - Valve Inspections

QEM Solutions were contracted to carry 3rd party inspection and witnessing activities on a series of valves fabricated in Germany for a series of SGN contracts throughout Scotland.

Tell Me More...
We are QEM Solutions We are QEM Solutions

We are problem solvers. We are organisers. From the project start-up to the very final evaluations and analysis, we can bring enthusiasm to each and every part of your project.

 

News Spotlight Are we doing it right? Effective meetings in Microsoft Teams

Since the Covid onslaught, businesses worldwide have adopted Microsoft Teams in place of meeting in person. And while it’s true that many of us are now adept with the software, it’s likely that others still use only the bits that suit them best. While we may get through the working day in one piece without some functionalities and etiquette, we could probably work better with the full toolset to hand. And why not? There’s still a long way to go before we’re all back in the office.

Read more...
 
Our projects

Our Projects

Combined, we have over 50 years experience, gained on a variety of projects throughout the world. But no two engineering projects are alike.

Sometimes we manage a project from the very start and continue to be involved until the end reports. Other times we are brought in to provide specialist services in specific areas. Each brings different challenges. Each has different outcomes.

We would like to share just a few of these projects here.

Show map

Our Projects

Spiecapag - Multi-Product Pipeline Project Services (552) Technical Writing

Spiecapag, Transnet

Johannesburg / Durban, South Africa
1 Aug 2009 - 1 Dec 2010

The new pipeline was designed to replace and enlarge the existing Durban to Johannesburg pipeline which transports petrol, diesel and jet fuel emanating either from the two Durban refineries or increasingly from imports. With an ever increasing fuel demand in South Africa the new pipeline provided the necessary increase in the capacity and flexibility of their existing pipeline inland network. QEM Solutions were assisting the Engineering & Construction teams with key resources required within the project.

Benefits of engaging QEM Solutions included:

  • Saving money on resources by engaging experienced and efficient personnel.
  • Instant energy and determination. 
  • Providing leadership to inexperienced colleagues including key skills and knowledge and imparted this knowledge to the people who needed it.
  • Acted as the glue between personnel with diverse cultural and behavioural differences and overcame many challenges of working effectively with multinational colleagues.
  • Acted as a communication channel between Joint venture parties and the client.

Main responsibilities included:

  1. Management of Setting Out & Fencing Sub-Contractors on 24" Pipeline.
  2. Assisted with tendering for 24" Stage 2 Contract, focusing on the Fibre Optic cables for the clients new telecommunication system, including deviation proposals based on feasibility and installation trials.
  3. Co-ordination of the specialist wetland team to produce specialist summary method statements for each in particular wetlands. Liaison with all parties involved and driving the production of the method summaries.
  4. Development of operational methodology and writing & review of method statements & risk assessments for all aspects of pipeline construction.
  5. Management of document control team.
  6. Management of QC activities including (temporary until resource was filled):
  7. Initial set up QA/QC department, prior to the arrival of the full time appointee. 
  8. Management of the QA/QC inspectors for pipe reception, stringing, bending and welding. Verification of the reports with client.
  9. Calibration certificates collaboration.
  10. Management of one Weld Procedure Specification and PQT's.
  11. Managed one field coating PQT.
  12. Liaised with the client & construction on any QA/QC issues.
  13. Managed NDT sub-contractor.
  14. Verification of the Welder Qualification Records.

 Services Breakdown

  Engineering Management
  Document Control
  Quality Management

 Engaged Specialists